Construction Process

1. Site Plan

(meet at lot to discuss site plan)

2. Framing

(walkthrough framed structure)

3. Rough In

(walkthrough to discuss placement of cable, electrical fixtures etc.)

4. Pre-Drywall Inspection

(walk through for detailed description what is behind the walls)

5. Trim Work

(walk through to discuss mantle  heights etc.)

6. 1st Punch List:

(typically this takes place 1-2 weeks before closing, you will do a detailed walkthrough each room and fill out punch list)

7. Final Walkthrough

(typically 3- 5 days before closing)