1. Site Plan
(meet at lot to discuss site plan)
2. Framing
(walkthrough framed structure)
3. Rough In
(walkthrough to discuss placement of cable, electrical fixtures etc.)
4. Pre-Drywall Inspection
(walk through for detailed description what is behind the walls)
5. Trim Work
(walk through to discuss mantle heights etc.)
6. 1st Punch List:
(typically this takes place 1-2 weeks before closing, you will do a detailed walkthrough each room and fill out punch list)
7. Final Walkthrough
(typically 3- 5 days before closing)